Case study

TOTAL’s deep sea Egina FPSO

  • LOCATION
    Nigeria
  • PARTNERSHIP
    TOTAL
  • MARKET
    Oil and Gas - Upstream topside

Project description:

  • Samsung Heavy Industries is turnkey contractor for TOTAL’s Egina FPSO, the largest FPSO (Floating Production Storage and Offloading) contract to date.
  • It is 330m in length, 61m across and 34m high, with a storage capacity of 2.3 million barrels

Customer challenges:

This project represents more than 2,200 km of power, instrumentation and control to service the FPSO platform, located 130km off the coast of Nigeria.

Nexans solutions:

  • The cables are specially designed to prevent gas leakages, making them much safer for use in flammable or high-risk environments. 
  • The project complies with local fire safety regulations and meets the strict technical specifications for IEC standards and Bureau Veritas certificate

Contact us

Topics on which you wish to get more informations:

Required fields*

Please check your entry and try again.

An email address must contain a single @

Personal data protector

You have the right to object to the processing of your personal data and/or their use for direct marketing or commercial purposes

Thank you!

Thanks for contacting us. We will be in touch with you shortly.

Error

An error occurred. Please try again.

Close